AssemblySub-AssemblyHours (Matt)Hours (Helpers)Total Time (To Date)
EmpennageElevator (left side w/trim)35.00035.00
EmpennageElevator (right side, no trim)26.00026.00
EmpennageHorizontal Stabilizer55.7522.2578.00
EmpennageRudder31.253.0034.25
EmpennageVertical Stabilizer18.50018.50
FuselageAft. Section5.0005.00
FuselageBulkheads3.0003.00
FuselageCabin32.50032.50
FuselageCenter Section46.00046.00
FuselageForward Section4.5004.50
Miscellaneous & PreparationShop Preparation6.5006.50
Miscellaneous & PreparationTaking Inventory17.001.0018.00
WingsAilerons29.50029.50
WingsFlaps29.25029.25
WingsFuel Tanks6.5006.50
WingsGeneral140.5018.25158.75





HOME | CONSTRUCTION LOG | THE SHOP | THE BUILDERS | F.A.Q's | LINKED RESOURCES | EMAIL US

This website was built to document our work in compliance with FAA requirements needed to certify our aircraft.
Our experiences and comments are by no means to be considered as instructions on how to build any aircraft.